New Bracket Design & Mould Development

Have a new bracket design that doesn't exist in our catalog? Our in-house tooling team can develop custom stamping dies, welding fixtures, and inspection gauges to bring your design to life.

Development Process

1

Concept Review

Share your idea, sketch, or CAD model. We assess feasibility.

2

3D Design

Detailed 3D model with material selection and load analysis.

3

Tooling Design

Progressive die design optimized for production efficiency.

4

Die Manufacturing

In-house die machining, heat treatment, and assembly (15-25 days).

5

Sample Approval

First-off samples for your testing and approval.

6

Mass Production

Full-scale manufacturing with dedicated tooling.

Investment & Timeline

Project TypeTooling CostTimelineMOQ
Simple bracket (single bend)Low20-30 days1,000 units
Complex bracket (multi-bend, welding)Medium30-45 days2,000 units
Multi-part assemblyHigher45-60 days3,000 units

* Tooling costs may be refundable or amortized based on total order volume.

Why Develop with CN Bracket?

  • In-house tooling team — no outsourcing delays
  • 15+ years of stamping die experience
  • Progressive die design for high-volume efficiency
  • Full intellectual property protection with NDA
  • Tooling ownership stays with you

Have a New Bracket Design?

Let's bring it to life. Send us your concept for a feasibility assessment.

Start Mould Project